Mark Kneipp Taranaki Basin 2D Seismic Case Study We successfully planned and acquired a dynamite 2D seismic survey in the Taranaki Basin. Project Summary 20 km 2D Seismic Survey in the Taranaki Basin, New Zealand. 800 Receiver Points, 400 Source Poi... 22 June 2025
Mark Kneipp Otway Basin 3D Seismic Case Study ResourceGeo was engaged to plan and execute a vibroseis 3D seismic survey over farmland in the Otway Basin. Project Summary 15.5 km² 3D Seismic Survey in the Otway Basin, South Australia. 4,007 Receiv... 22 June 2025
Mark Kneipp Cooper Basin 3D Seismic Case Study We planned and executed a vibroseis 3D seismic survey in the Cooper Basin using low impact, high production techniques. Project Summary We planned and executed a vibroseis 3D seismic survey in the Coo... 22 June 2025
Mark Kneipp Eromanga Basin 3D Seismic Case Study ResourceGeo was engaged to project manage a large vibroseis 3D seismic survey in the Eromanga Basin. Project Summary 208 km² 3D Seismic Survey in the Eromanga Basin, Queensland. 38,533 Receiver Points... 22 June 2025
Mark Kneipp Amadeus Basin 2D Seismic Case Study Project Summary 2D Seismic Survey in the Amadeus Basin, Northern Territory. 20km main line with 5 parallel ghost lines + 2 receiver grids 4,758 Receiver Points, 1,592 Source Points. Timeframe - Planni... 22 Oct 2024
Mark Kneipp Bowen Basin 2D Seismic Case Study Project summary 124km 2D Seismic Survey in the Bowen Basin, Queensland. 12,397 Receiver Points, 12,397 Source Points. Timeframe - Planning 160 days, Delivery 18 days. Seismic contractor - Terrex Se... 22 Oct 2024